Plant Installation at Finlays Tea Exctract (K)Ltd

Client: Finlays
Project Start: 05/07/2024
Product Required: 5900 Product
Investors Website: https://www.finlays.net/
Client Location: Kericho , Kenya
Other: Your Custom
Contact Form

About Project

  • Batch Tank Equipment & Accessories Installations
  • Drier Equipment & Its acccessories Installations
  • Evaporator Equipment & its accessories installations
  • Process Water Line Plumbing Works
  • Chilled Water for Cooling
  • Liquor/Product Piping
  • Chilled brime  piping
  • Compressed air
  • Condensate Piping
  • CIP Piping
  • Hot Water piping
  • Chemical Transfer Piping
  • Demolition of existing drier
  • Construction/Modification of steel tower & platforms to hold the tanks

Challenges & Our Response

Challenges may have included:

  • Integrating new equipment into existing infrastructure.
  • Ensuring minimal disruption to ongoing operations.
  • Adhering to strict hygiene and safety regulations within a food processing environment.
  • Dealing with the logistical challenges of working in a remote location.

Case Study: Enhancing Plant Efficiency at Finlays Tea Extract (K) Ltd.

Case Study: Enhancing Plant Efficiency at Finlays Tea Extract (K) Ltd.

  • Finlays Tea Extract (K) Ltd. is a key player in the global tea extract market, known for its high-quality, sustainable production.
  • To maintain its competitive edge, Finlays requires continuous upgrades and expansions of its production facilities.
  • SHEP Engineering, with its expertise in structural and mechanical engineering, was contracted to provide essential plant installation services.
  •